tech-vidhya
 
Telecom Portal | Search Telecom Jobs | Telecom News | TeleQuiz | Telecom Tutorials | Telecom Forum | Partners | Recent Placements | Clients | Downloads | Articals

BTS-Training RF-Training 3G-Training
telecomservices
Tech-Vidhya Certified BTS I&C Engineer
itservices
  Bookmark and Share  
 
Course Objective:
 
     
 
The course aims to aware candidates about BTS site installation, commissioning, integration & testing and provide them depth knowledge of complete cell site and GSM Technology.
 
     
 
Course Overview:
 
     
 
This training program is designed to give comprehensive overview of Communication system, GSM system & CDMA system to the candidates. On the later modules, program is entering into the totally practical approach of Telecommunication industry with giving the brief ideas of telecom terminologies and equipments used at cell site. After completion of training, candidates will familiarize with various RF Segment such as RF survey, Civil work, Installation and Commissioning, AT, Quality Audit, Health and safety precaution etc. Telecom management solutions and the grooming sessions of the training program, enhances the capability of the candidates for getting easy approach for management level. The course ends with the practical in lab and practical at on site exposure so that candidates will get live on-site working experience.
 
     
 
Course Contents:
 
     
 
Module-A : Introduction to communication
History of communication, What is GSM, Evolution of GSM, Fundamentals of GSM, GSM Architecture, Understanding GSM channels, Call flow in GSM system, Radio interface, advantages of GSM, GSM traffic management, GSM transmission, GSM 900/1800/1900, What is CDMA, Evolution of CDMA, spread spectrum techniques, CDMA system architecture.
 
Module-B : About the Cell Site & Outdoor Equipments
What is cell site, Introduction & classification of cell site, Telecom Towers, Diesel Generator, Shelters, AMF panel, Earthing Pits, Lightning Arrestors, Aviation Lamps, Pole Mounts, Outdoor Cable Trays (HCT & VCT), GSM Antenna & Accessories (Tilt Arrangement, Antenna Clamps etc.), RF cables & Accessories (RF cables, Jumper cables, RF connectors, RF Clamp, RF Earthing Kits, Whether proofing Kits & Surge Arrestors etc.).
 
 
   
Module-C : About the Indoor Equipments
Introduction-classification-Working Principle-Manufacturer of Roxtec, Cable tray (indoor-HCT),Servo-stabilizer, Power Interface Unit, Power Plant, Air-conditioner, Battery Bank, Alarm panel, ACDB, DCDB, DDF, IGB, Transmission Rack etc.
 
Module-E : Introduction to Fundamental BTS
Introduction to BTS, Fundamental Block diagram of BTS, Different cards/module of BTS, Functionality of each cards/module in BTS, Fundamentals of Diversity Technique, Sectorization in BTS, Career configuration in BTS, Alarms of BTS, Terminology used in BTS etc.
 
   
Module-F : Tools & Test Equipments Used for  BTS I&C
Introduction-Specification & Use of Tools (Spanners, Screw Drivers, Hammers, Cutters, Crimping Tools, Knife, Hack Saws, Drill Machine, Soldering iron, Tilt Meter, Compass, RF Cutter, Sprit Level, Allen Key, Rope, Pulley etc.), Test Equipments (Laptop, Power Meter, VSWR Meter, Site Analyzer etc.) Health & Safety Tools (Helmet, Safety Belt, Gloves, Boot, First Aid Box etc.)
 
Module-G : I &C of BTS and Associated Equipments
RFI Survey and report Generation, Preparation of Material Requisition Note (MRN), Finalization of tool kit according to work, Selection of Team according to work, Verify List of materials used at sites, Unpacking of materials, Initial reporting from site, Installation process, Finalization of Installation, VSWR measurement of RF cable, BTS commissioning, Integration of cell site, Alarm Testing, Call Testing, Call Handover Testing, Preparation of Site Documentation, Punch points check & Quality Check etc.
 
   
   
   
 
 
By the end of this course candidates will be able to:
 
     
  Talk about cell sites and GSM.  
  Handle equipments used at cell site.  
  Understand functionality of BTS .  
  Understand functionality of Battery Bank & Power Plant etc used at sites.  
  Install, commission and Integrate BTS Sites.  
  Check site Installation as well as commissioning quality.  
  Manage installation as well as commissioning team and make documents for the sites.  
     
 
Method of Training:
 
     
 
Providing well designed training material to all the candidates, Lectures by qualified & highly experienced trainers. Provide details classroom study and practical in lab/on site field study, Group discussion, Question & Answer. The candidates are thoroughly assessed during the training by regular written test and interviews and finally ranked according to their performance.
 
     
 
How to Apply:
 
     
 
Fill online registration form and make a payment of Rs. 551/- (Registration fee for Indian resident only) by different payment options or Download registration form, fill it and send it along with the D.D./cheque (in the favors of “Aayan Infratel Pvt. Ltd.” payable at Jaipur) or visit our training center.
 
     
 
Misc Information:
 
 
     
 Course Code :    T-V/WT/C002  
 Duration :    60 days  
 Mode :    Classroom/Lab/On site  
 Eligibility :    BE/B. Tech/Diploma Engineers in (ECE/EEE/CS/IT)  
 Placement :    100%* placement assistance  
 Certification By :    Tech-Vidhya  
 
     
 
Contact Information:
 
 
     
 Email :      training@aayaninfratel.com  
  :      techvidhya@aayaninfratel.com  
 Mobile :      +91-9785705947  
     
 
 
  back applynow Bookmark and Share
 
     
 
sadow
Explore
Home
About Us
Contact Us
FAQ
Articles
Career in Telecom
Growth of Telecom
Courses
Tech-Vidhya Certified RF I & C Engineer
Tech-Vidhya Certified BTS I & C Engineer
Tech-Vidhya Certified MW I & C Engineer
Tech-Vidhya Certified Summer Training in BTS I & C
Tech-Vidhya Certified 3G I & C Engineer
Tech-Vidhya Certified RF & DT Engineer
 
TelecomSeva
Telecom Portal
Telecom Jobs
Telecom News
Telecom Forum
Telequiz
Telecom Tutorials
Telecom Blog
Networks Sites
Entertainment Portal
Bollywood News
Free Classified
Job Portal
Sports News